Projects

Projects

Home > Projects
SCHOOLS - PROJECT CLIENT SCOPE YEAR
DRIVER PRIMARY SCHOOL T20-2102 DIPL Construction of shade structure over existing basketball courts 2021
MACKILLOP VET CENTRE RA- 20109 CATHOLIC EDUCATION OFFICE New VET training facility consisting of a portable 2021
HENBURY SCHOOL T20 – 1480 DIPL Provision of solid shade structure over the basketball court 2020/21
CASUARINA SENIOR COLLEGE T19-1875 DIPL Library Refurbishment including asbestos removal, demolition, steel fabrication, suspended ceilings, mechanical, electrical, plumbing, flooring, gyprock, painting and installation of specified items 2020
STUART PARK PRIMARY SCHOOL T19-2008 DIPL Construct solid covered shade structures and pergola structure 2020
PALMERSTON COLLEGE T19-2177 DIPL Covered walkways 2019/2020
HOLY FAMILY CATHOLIC PRIMARY SCHOOL RA18-122 CATHOLIC EDUCATION OFFICE New covered entry walkway 2019
GIRAWEEN PRIMARY SCHOOL T19-1432 DIPL Design and construct solid shade structure over existing courts 2019
CASUARINA SENIOR COLLEGE - T19-1132 DIPL New container art gallery 2019
WAGAMAN PRIMARY SCHOOL T18-2010 DIPL Construct new covered outdoor teaching area 2019
CASUARINA SENIOR COLLEGE - ONGOING - over 10 years CASUARINA SENIOR COLLEGE Continuous repairs and maintenance on school grounds. Time and noise restrictions are strictly adhered to. Services have included demolition, concreting, roofing, plastering, civil works, electrical, plumbing, painting, removal and relocation of heavy items, removal of asbestos, construction of retaining walls, construction of bike shelter, construction of accessible ramps, repairs post vandalism and repairs to doors, ceilings etc 2019
PALMERSTON MIDDLE SCHOOL AND COLLEGE - ONGOING - OVER 1 YEAR ROSEBERY MIDDLE SCHOOL Concreting, painting, plumbing, electrical, landscaping, relocation of containers, repairs and maintenance post vandalism 2019
ROSEBERY MIDDLE SCHOOL T17-2206 DIPL New undercover bus shelter 2018
DARWIN MIDDLE SCHOOL T17-2479 DIPL New undercover bus shelter 2018
NAKARA PRIMARY SCHOOL NAKARA PRIMARY Painting of numerous classrooms, library and main administration area. Demolition and gyprock work. Concreting and repairs and maintenance 2013
TAMINIMIN COLLEGE T11 -2024 DIPL Construction of new classroom 2012
MOIL PRIMARY SCHOOL T11-2003A DIPL drop off zone, civil work and walkway 2012
SANDERON MIDDLE SCHOOL SANDERSON MIDDLE SCHOOL Removal of trees 2011
PARAP PRIMARY SCHOOL T09-1684 DEPARTMENT OF INFRASTRUCTURE Structural upgrade of assembly hall and after school facility. Installation of sports floor surface and sports equipment. Specified ventilation and light system. 2011
ST JOHNS COLLEGE AUST TECHNICAL COLLEGES Teaching kitchen upgrade. Upgrade of the home science classroom to accommodate new commercial kitchen fit out. Required electrical and plumbing upgrades, replacement of walls, ceilings, flooring, doors and windows, installation of grease traps cut through existing concrete slab. 2010
MILLNER PRIMARY SCHOOL T07-2126 DIPL Enclosure of the assembly hall with installation of ventilation and circulation system 2008
CASUARINA SENIOR COLLEGE T07-1483 DEPARTMENT OF INFRASTRUCTURE Structural upgrade of the school's gymnasium roof, walls, doors and associated services to comply with category 4 cyclone standards. Close working relationship with school body to prevent any disruption during school hours and continual discussion with consultants to achieve compliance with standards without compromising the use of the gymnasium. 2008
NEMARLUK PRIMARY T06-1581 DIPL Design and construct of 2 new learning areas for special needs education and ablutions block 2007
GRAY PRIMARY SCHOOL - T06-1067 DIPL Upgrade to care takers residence 2006
MOULDEN PRIMARY SCHOOL - T06-1067 DIPL New undercover walkways 2006
NAKARA PRIMARY SCHOOL DIPL Upgrade student, staff and preschool bathrooms 2005
PROJECT CLIENT SCOPE YEAR
HOWARD SPRINGS QUARANTINE FACILITY DIPL Various works: undercover walkways, concreting, kerbing, repairs and maintenance, essential works. Adherence to strict protocol and guidelines at all times whilst entering, exiting and working with the HSQF. 20/2021
DARWIN RAIL TERMINAL -T20-1086 AND T20-1756 (current) DIPL Kerbing and Paving safety upgrades 2020
NT ARCHIVES - T19-2149 & T19-20145 DIPL Construct new office and bathroom 2019
CASUARINA COASTAL RESERVE T17-1652 DIPL Fabricate and install stainless steel fence at dripstone cliffs 2017
ARAFURA STADIUM DIPL Construct shade structure for viewing platform 2017
HIDDEN VALLEY RACEWAY DIGGAMEN CIVIL CONTRACTORS Construction of viewing platform to raceway. Concrete construction, structural and balustrade 2016
LOT 5845 VERRINDER RD, TIVENDALE PRIVATE Design and construct 1600m2 of office and workshop on land area on 4000m2. Requirements include overhead gantry crane, concrete hardstand and ability to accommodate 2 tenancies if required. Design, drafting, shop drawings and structural steel fabrication all performed in house by NSCON. 2015
D12-0304 MATHEW HOPKINS RD LAND DEVELOPMENT CORPORATION Design and construct office, workshop and hard stand for heavy equipment maintenance. Land area of 8000m2, workshop 1600m2 with additional office space. Designed to accommodate entry and exit of large machinery and vehicles. Requirements included ground service pit, spillage containment and drainage, overhead gantry crane. Located in the defence hub, established to provide support to the defence industry. 2014
NGD01729-12 CHANNEL ISLAND POWER WATER CORPORATION Construction of new office building and carpark. Specifics included sourcing specialised materials to reduce noise levels from close proximity turbines. High standard of OHS compliance met as provided on contactor performance report issued on completion of project. 2013
HIDDEN VALLEY RACEWAY - T11 2100 DEPARTMENT OF INFRASTRUCTURE Construction of concrete barriers on section of raceway (approx 60 barriers x 4m in length) Constructed by NSCON offsite and delivered and installed onsite on time for V8 Super Cars 2012
WEDDELL POWER STATION - MGD01758-12 POWER WATER CORPORATION Construct new office building at Weddell Power Station and fit out. 2012
CHANNELL ISLAND POWER STATION - NGD - 00683-06 POWER WATER CORPORATION Extension to workshop and gate house 2006
10 MANDER RD, HOLTZE PRIVATE Office and workshop 2006
PROJECT CLIENT SCOPE YEAR
HOUSING STIMULUS - 180995, 180885 DEPT OF HOUSING Complete roof replacement of various public housing properties, project management 2018
8 BELLE PLACE, MILLNER KIGO DEVELOPMENTS Design and construct boutique complex of 4 storey, 10 X 2-bedroom, 2-bathroom units. Focus on open plan living and capturing prevailing breezes. In house building design, drafting, design management and construction. Average of 120m2 per unit. 2014
39 GUMUNGGWA ST, LYONS PRIVATE Project encompassed design and construction of a 2 storey, 3-bedroom, 1 study and 3-bathroom home to accommodate a young, growing family. The key requirements included use of natural light, practical living areas, open plan design with a contemporary style whilst adhering to Lyons residential guidelines 2012
6 MANGOLA CRT, LARRAKEYAH KIGO DEVELOPMENTS Design and construct boutique complex of 5 storey, 6 X 2 and 2 X 3-bedroom units. Specifics included open plan living, pool, undercover parking, stand-alone apartments on floors 4 and 5, large balconies, high quality finishes and ample storage. 2010
HOUSING UPGRADES - T03-1108 DIPL Upgrade works to public housing in Darwin, Palmerston and Casuarina 2003
HOUSING UPGRADES - T03-1638 T06-1036 DIPL Manufacture and Install aluminium security screens to public housing in Darwin, Palmerston and Casuarina 2003
26 SERGISON CCT, RAPID CREEK PRIVATE Design and construct boutique complex of 4 storey, 9 X 2-bedroom, 1-bathroom units. Specifics included open plan living, capture prevailing breezes, large verandas, undercover car park. Average of 120m2 per unit. 2002
9 BELLE PLACE, MILLNER PRIVATE Design and construct boutique complex of 4 storey, 9 X 2-bedroom, 1-bathroom units. Specifics included open plan living, capture prevailing breezes, large verandas, undercover car park. Average of 120m2 per unit. 2001
Share by: